Waterproof construction method of toilet tiles how

2022-07-22
  • Detail

When the new house is decorated, the bathroom will definitely use tiles. In addition, the bathroom is a place that needs to be exposed to water every day, so many owners will pay close attention to and worry about whether the tiles are waterproof. Today, Xiaobian will introduce the construction method of waterproof tiles in the bathroom to you. Let's have a look

when decorating a new house, the bathroom will definitely use tiles. In addition, the bathroom is a place that needs to be exposed to water every day, so many owners will pay close attention to and worry about whether the tiles are waterproof. Today, Xiaobian will introduce the construction method of waterproof tiles in the bathroom to you. Let's have a look

1. Waterproof construction method of toilet tiles

a. clean the maintenance surface

first, remove the stains and sundries on the surface of the tiles. If there is dust, oil stains or ponding on the surface, it should be cleaned up, and the surface should also be kept dry. The original glass glue or other waterproof materials should be clear and clean

b, clean up the cracks in the tiles

clean up the insufficiently strong fillers in the floor tiles. Remember, don't empty the cracks in the tiles, just clean up the fillers that don't explain

c, spray waterproof agent

each part of the ceramic tile needs to be sprayed with some waterproof agent, and when spraying, it must ensure that the spraying is uniform. After the waterproof agent is completely dry, it is necessary to use joint sealant to fill all the ceramic tile joints, pipe roots and damaged and defective parts, including the wall tile that can be drenched with water

d, plastic steel mud as waterproof edge

if there is a large gap in the connection between the ground and the wall, plastic steel mud should be used here as waterproof edge. The surrounding of the pipe root and the surrounding of the floor drain, the damaged and defective parts of the tiles, and the threshold are all weak links. Plastic steel mud should be used as waterproof edge sealing, and the paste should be firm and tight enough

e, stop using open water to dry

after the waterproof construction process is completed, ensure that the position constructed within 48 hours does not touch water, and do not see water until the joint sealant plastic steel mud is completely dry. The construction method of waterproof tiles in the bathroom is introduced

2. How to use the waterproof agent well

when painting waterproof materials, you can use a nozzle to spray, or you can use a brush to brush directly. If you can, it is best to brush while painting for construction, so that the waterproof agent can be evenly distributed on the surface without leakage, and will fully penetrate into the surface, playing a good waterproof effect

Xiaobian conclusion: the above is all about the knowledge of toilet tile waterproofing. I believe everyone should have a certain understanding through the cognition of Xiaobian's finishing content. Some owners may say that it's OK to leave these to the decorators, otherwise why spend money on them? That's right, but as an owner, it's necessary to understand these basic decoration common sense, which can play a supervisory and auxiliary role in the decoration, so why not

兰州银屑病医院

北京眼科医院

重庆皮肤病医院

义乌男科医院

Copyright © 2011 JIN SHI